boiler plant upgrades

Design collaboration on the Wilkes Barre Boiler Plant replacement project provided a better equipment layout and is anticipated to improve plant efficiency by at least 7% through the installation of economizers.

Due to the existing facility’s physical site constraints, the considerable space needs for the Boiler Plant, and the need to maintain continuous plant operation in supplying steam to the facility, four (4) design options were developed.  The selected option and subsequent design is based on constructing a 4,000 SF new/expanded boiler plant, new control room, and ‘shell space’ addition (for a future chiller plant).

As we mark 13 years in business today, we have a lot to be thankful for…

#architecture #engineering… https://t.co/3H6UvDhzGz

See, swirl, sip, savor, and swallow🍷

Huge thanks to Mr. Matthew Kurtas for taking AE Works through a night full of… https://t.co/755FndFVS2

Today at 2:30! Take a quick coffee break and tune in to our newest episode, Social Distancing in the Workplace. https://t.co/UW4kYwRL1C